R.A.P.P.
Project, Pekanbaru (1991 - 1994)
Project Owner : PT. Riau Andalan Pulp & Paper
The total amount of cargo is 215.000 FT (Include
85.000 FT civil engineering materials).
Among others, 30% of them are Heavy Cargo up to
150 tonne piece weight.
Tambak Lorok CCPP Project,
Tambak Lorok, Semarang, Central Java
(Mei 1995 - Jan 1997)
Project Owner : PLN
Main Contractor : Sumitomo Corporation
Supervisor : Nippon Express Co, Ltd.
60.000 FT Machineries
(12.000 FT Heavy Lift up to 250 tonne piece weight
and 48.000 FT General Cargo)
Semen Cibinong Expansion
Project Palimanan, Cirebon, West Java
(1995)
Project Owner : PT. Indocement Tunggal Prakasa
27.000 FT (Heavy Cargo150 tonne piece weight).
Paiton Private Power
Plan Project Unit 7 - 8, Paiton, East Java
(Okt 1996 - Des 1997)
Project Owner : PT. Paiton Energy Co,
Main Contractor : Toyo Engineering Corp.
Siemens Jawa Power unit
5 - 6, Paiton East Java (Jun 1998 - Feb
1999)
Project Owner : Jawa Power
Main Contractor : Siemens
12.000 FT (Heavy Cargo up to 410 tonne piece weight).
Renun Hydroelectric Power
Project, Sidikalang, North Sumatra (Jun
1996 - Sep 1996)
Project Owner : PLN
Joint Operation : Hyundai - MBRC - JINRO
21.500 FT (General Cargo)
Polyester Staple Fibre
Project, Bojonegara, West Java (Nov 1996
- Mei 1998)
Project Owner : PT. Pacific Fibretama Corp.
Main Contractor : Nigata Engineering Co, Ltd.
15.000 FT (General Cargo)
Jatiluhur
Power Plant Project, Jatiluhur, West Java
(Apr 1995 - Des 1996)
Project Owner : PT. Indokomas
5.000 FT (General Cargo)
Gresik Octanol Project
(G.O.P), Gresik, East Java (Sep 1996
- Mei 1997)
Project Owner : PT. Petro Oxo Nusantara
Main Contractor : Mitsubishi Heavy Industries
Supervisor : Nippon Express Corp.
20.000 FT (Heavy & General Cargo)
I.K.C. Project, Tarjun,
South Kalimantan (Sep 1996 - Jul 1997)
Project Owner : PT. Indo Kodeco Cement
Main Contractor : Marubeni Corp.
6.000 FT (General Cargo)
A.A.I. Project, Anyer,
West Java (Apr 1997 - Mar 1998)
Project Owner : PT. Trypolita
Main Contractor : Mitsubishi Heavy Industries
25.000 FT (Heavy & General Cargo)
Bontang LNG, PT. Badak
Train "H" (Mei 1997 - Des 1997)
Project Owner : PT. Badak LNG
Main Contractor : IKPT
50.000 FT (General Cargo)
Tuban Olefin Project,
Tuban, East Java (Planned Jul 1997 -
Des 1999)
Project Owner : PT. Trans-Pasific Petrochemical
Indotama
Main Contractor : Stone & Webster
Supervisor : Nippon Express Corp.
200.000 FT (Heavy Lift up to 1.000 tonne piece
weight)
Done: 25.000 FT (General Cargo). During in progress
project suspended December, 1997.
|